mercredi 14 septembre 2011

Approval!


We have recently been approved to construct our full-scale rainwater catchment system on the campus of Natural Bridges High School.  We are still waiting to find out if our specific design will be approved or whether the design needs to be modified.  If our design is approved, the catchment barrels will be placed in the open space visible in the picture above, with underground pipes running to them from the roofs of the classrooms nearby (as described in the post describing wet systems).

Aucun commentaire:

Enregistrer un commentaire